Beta closed · Early adopters now open, by invitation · Request an invitation →Beta closed · Early adopters, by invitation →
LoadIt.liveLoadIt.live
Sign in
§ Early adopters · By invitation only · One factory or forty

LoadIt plans every order to ship on time, on the line that runs it best, with no capacity left on the table.

Upload your order book. In minutes every order is placed on your factory's own settings, and any that can't make its date is named, with the reason, on day one. The plan you get is one your floor can run.

What's insideLate orders named on day oneSame book, same planNever sewn before the fabricReplan in minutesT&A milestonesGSD line balance
✓ Planned on your own order book
✓ Set up for you
✓ Nothing shared, nothing trained on
§ 01 / What the plan is built to do

Past twenty lines, nobody can hold the whole plan in their head. The engine can.

One factory or forty, across the world: any number of lines, any number of orders, planned in minutes on the rules you set, and the same rules applied to the last order as the first, in every plant. Two thousand orders across fifty-eight lines is a normal morning. The industry celebrates getting the weekly plan down from five days to one; this is the product, not an add-on, and it takes minutes. The plan is built to do three things.

01 · Efficiency

Every order on its most efficient line.

The engine knows what every line does with every product group and places each order where it runs best, across the whole book at once, not one line at a time and not from memory.

How: your efficiency matrix drives placement.
02 · Capacity

No capacity left on the table.

A hand-built plan leaves lines idle between orders, because a person cannot re-place two thousand orders every time one moves. Work goes where capacity exists, not where the queue was. Idle line-days are money you already paid for.

How: dispatch, not append.
03 · Ship dates

Every shipment on time, or named late on day one.

With the reason: capacity, material gate, calendar. You know at upload, not in the week it ships, so there is time to act. Nothing is hidden inside a colour code.

How: every rule, every order, every run. Same book, same plan.

A plan that does all three is a plan your floor can actually run: no line past its capacity, no order cut before its fabric, no work on a holiday. Board, export and floor read one number.

Think your current plan already does all three? Bring your order book and check.

§ 02 / See the whole plan

The plan, the problems and the reasons.

Four screens a head of planning opens every morning. Drawn here with made-up orders; yours show your own book.

Cockpit

Only the problems, every morning.

Late and at-risk schedules first, by schedule, buyer, line or ship week. Load and open hours beside them.

CockpitPlant 1 · 58 lines
Problems shipping in theNext 1 weekNext 2 weeksAll
96.4%
On time by schedule
3 of 64
Late schedules
91%
Load, next 4 weeks
+12k h
Open hours, next 3 months
● 3 schedules late · worst 4 days● 8 at risk · 5 days or less to spare
Schedule · buyerShipsEntities lateWorst
4415 · Buyer ATue 13 Oct2 of 34 days late
4482 · Buyer CFri 23 Oct1 of 52 days late
4530 · Buyer AMon 9 Nov3 of 81 day late
Order Journey

Every order has a history. Ask it why.

Every change in the book and every plan run, replayed. Where the order is, when it will be ready, and the reason.

Order Journey4415 · Navy · Buyer A
Fabric in
2 Oct
Ship date
13 Oct
Now, in this plan
Not planned yet
Fabric in
Ship
Booked
Planned
Materials
Sewing
Ready to ship
The reasonIn the book: 9,600 pcs, fabric in 2 Oct, ships 13 Oct.
Pulse

What changed since yesterday, and why.

On time, run by run. Open any run to see what changed before it and which schedules it moved.

PulseWhat changed since the last plan, and why
Last run · Replan All · 9 s
On time by schedule 95.8% → 96.4% · late schedules 4 → 3
What changed before this runSchedules
Ship date moved in the book9
New in the book14
Left the book3
Line closed (holiday)1
Benchmark

Your plan and ours, scored on your rules.

Upload the plan you run today. Both plans are scored on the same book, calendar and efficiencies.

BenchmarkYour plan against LoadIt's, on your factory's rules
Your current plan
78.4%
on time, as planned
LoadIt
96.9%
on time, as planned
RuleYour planLoadIt
Sewn before material is in14 orders0
Sewn on a holiday9 orders0
Days over the factory’s operators41 days0
Late schedules113
Same order book, calendar, efficiencies and operators for both plans.
§ 03 / Early adopters

Early adopters. By invitation only.

We open LoadIt to a few manufacturers at a time, so every factory is set up properly and planned on its own book. Request an invitation, or use the one we sent you.

Stage 1

Beta partners

✓ Closed

Manufacturers who planned with us while LoadIt was being built. Special rates.

One plant's full order book has been planned in LoadIt every day since 1 August, side by side with its own plan.

Stage 2 · now

Early adopters

● Open, by invitation

A few manufacturers at a time. Early-adopter rates, locked for 24 months.

Stage 3 · later

General availability

Later

Open to every manufacturer, on the standard rate card.

How we build it with you: every request is read by the people building LoadIt, improvements ship every week, and early adopters shape what we build next.

What you get
  • Early-adopter rates, locked for 24 months, on the one rate card every manufacturer is priced on.
  • A pilot on your own order book, beside your current plan. We set up your factory; you judge the plan on your own numbers.
  • Bring your current plan: we score it beside LoadIt’s, on your own rules.
  • A direct line to the people building LoadIt.
  • A say in what we build next.
  • First places for your planners on the LoadIt certification.
What we ask
  • Your real order book, as your ERP exports it.
  • A named planning lead for the pilot.
  • A short weekly review with us during the pilot.
  • Honest feedback, good and bad.
How it works
  1. Request an invitation. Five minutes: your size, what you make, how you plan today.
  2. We reply within two working days. We read every request ourselves.
  3. Your book, planned. Invited manufacturers get the factory setup form; we build your factory and plan your real book.
§ 04 / The shift

Stop reacting. Start orchestrating.

Ask any factory how closely production followed the plan. Not whether the goods shipped; whether order ABC ran on line 2 for the ten days it was planned to. Few factories measure it, and where they do, a single-digit improvement makes a headline. The goods shipped because someone reshuffled the board every afternoon, threw people at the fires, and paid for it in overtime, changeovers and air freight that never appear in the on-time number.

Plans get abandoned because they never contained the things that break them: the fabric date, the line's real efficiency, the holiday, the style changeover, the buyer's gate. LoadIt puts every one of them into the plan up front, for every order, so the plan you issue on Monday is still the plan on Thursday. When something genuinely changes, the whole book is replanned in minutes on the same rules. That is the difference between reacting and orchestrating.

⊙ React · plan first, discover the constraints later

The plan is a hope. The week is a fight.

The plan goes out with the fabric date, the line's real efficiency and the holiday calendar left out. Each one turns up mid-week as a surprise, and every surprise moves three orders. By Friday the board looks nothing like Monday, and the goods shipped anyway, because people made them ship.

Planned vs what ran planned actual
PO-4401Line 2
PO-4415Line 2
PO-4430Line 3 → Line 5
PO-4445Line 3
PO-4460Line 4 → split ×2
2 of 5 ran as planned3 reshuffles · 1 line change · 1 split · 6 changeovers nobody planned
⊕ Orchestrate · every constraint in, before the first cut

The plan is the plan. The planner runs it.

Fabric dates, calendar, style changeovers, buyer gates and line efficiency are all in the model before the plan exists. What can still change (a buyer moves a date, a genuine fabric delay) is a replan of the whole book in minutes, on the same rules. The planner issues the plan and keeps the floor on it.

Planned vs what ran planned actual
PO-4401Line 2
PO-4415Line 2
PO-4430Line 3
PO-4445Line 3
PO-4460Line 4
5 of 5 ran as planned1 replan (buyer moved a date) · re-issued the same morning
Plan-to-execution: how much of what was planned actually ran where and when it was planned, allowing only for efficiency drift. It is a number worth putting on the wall. Read it alongside the three criteria below; a padded plan can hit 100% and still lose money.
§ 05 / Why the plan changes

Every planner knows this Wednesday.

Four ways a plan goes wrong that no setting fixes. Each one is a Wednesday afternoon, and each one is money the on-time number never shows.

01

The fabric date was never achievable.

The plan is built on the date the mill was asked for, not the date the mill can hit. So it changes the day the fabric doesn’t arrive, and it changes the same way next month.

LoadIt holds the order until the fabric is in. The gap between the date asked and the date delivered stays visible on every order, so a lead-time problem shows up as a pattern, not a surprise.
02

Planned at an efficiency the line never hits.

Planners load lines at 80% to push the plant. The line runs at 62%. The gap becomes overtime and late orders, and the plan looked fine on Monday.

LoadIt plans on the efficiencies your lines actually run at, from your own history. Nothing is loaded past what the line can make.
03

Only the next few weeks are planned.

Drag-and-drop is slow, so the near horizon gets placed and the rest of the book sits unplanned with no dates blocked. Weeks later those orders are squeezed in around everything already there, and shortcuts get taken.

LoadIt plans the whole book, near and far horizon, in minutes. Every order has a line and a date from the day it is uploaded, and if one doesn’t fit, you know before it is confirmed.
04

Every move knocks on, so nobody replans.

One change moves three orders, three changes move the board, the floor stops trusting it. So the plan is touched weekly and the week is spent reacting.

LoadIt replans the whole book in minutes on the same rules, and the same book always gives the same plan. Replan every morning.
Everything else A buyer moves a date. A line loses operators. Output runs below plan. None of that can be planned in advance and we don't pretend it can. It is a re-import and a replan: minutes, not the week. The late orders it creates are named the same morning.
§ 06 / Under the hood

Nobody else runs your factory on one model.
We do.

Every other tool keeps line balance, T&A, machine logistics, and the production board in separate places: exported, emailed, reconciled, and out of date. LoadIt collapses all four into a single live model. When anything changes, everything responds.

Pillar 01 / The IE workbench

Line balance, built in.

Import your GSD or operation bulletin. LoadIt auto-balances across three solver modes (flat, cross-section, section-strict), finds the optimal balance point (fewest operators, highest balance), and saves the validated efficiency straight into your planning engine. What used to take an IE team a week now takes the system seconds.

takt 0.71Stn 1Stn 2Stn 3Stn 4Stn 5Stn 6BTN
Operators
6 (was 14)
Balance
76%
Output
85/hr
Saves
3 floaters
The IE saves once. The plan picks it up automatically. No more efficiency assumptions.
Pillar 02 / The T&A calendar

Milestones that move with the plan.

Every order has a live T&A, anchored to the planned sewing start, not a guessed ship date. Hard gates (Fabric In-House, PP Sample Approved) hold the order until pre-production is real. Buyer-specific rules supported. Mark a milestone done once and it cascades across every order sharing the style.

PO-4401 · Polo SS · Anchored to sewing start (Wed)
SEW
Fabric Ord
Trim Ord
PP Sample
Fabric In
Cut Done
Sew
QC
Ship
Buyer pulls ship date 4 days → all upstream milestones recompute
When the plan moves an order, every milestone moves with it. Nothing is tracked in a separate file.
Pillar 03 / The machine planner

Cross-factory machine logistics, solved.

When one plant is short of a machine type, LoadIt finds the fewest donor factories in your group and generates the transfer plan: quantities, lead times, ship-by date. Rental is flagged only when the group can't supply. Overview, heatmap, line requirements and movement plan in one place.

Plant 2, Sep 2026
Source factory
Iron
Btn
Plant 1 BEST
+8
+2
Plant 3
+2
0
Plant 4
0
0
⇨Transfer plan: 8 Iron + 2 Btn from Plant 1 · zero rental · ship by Sep 28
Engineering's machine logistics, in the planner's view. No more phone calls.
Pillar 04 / The production board

A board that plans itself.

Replan all places every order on ship date, style changeover, line efficiency and hard-gate milestones, and the same book gives the same board every time. Change anything, replan, and the board takes the new plan only when it is better. Late orders are shown with the reason. Hover any order to see what is happening; nothing needs dragging.

Mon
Tue
Wed
Thu
Fri
A · 32
PO-4401
PO-4408
PO-22
B · 28
PO-30
PO-4445
PO-50
C · 30
PO-71
PO-60
Replan all ran● 2,000 orders / 58 lines / 3.1s
The plan is decided by the engine. The planner issues it and runs it.
Early adopters · By invitation only

Built for the planner who's tired of rebuilding the plan.

From a single factory of a few hundred operators to a group of forty plants and tens of thousands of operators across the world. Woven, knit, seamless. The same rules in every plant, and the plan in minutes, whatever the size of the book.New modules and improvements ship every week.

⊙
Your data stays yoursIsolated, encrypted, exportableRow-level isolation per factory, encrypted at rest and in transit, exportable at any time. Nothing is used to train any model.
⇨
Direct lineThe people building itReplies within a day. Issues are usually fixed and deployed within a few days. Your asks shape what ships next.
⊕
Nothing to installBrowser, sign in, doneNo servers, no licence keys. Sign in with Google or email and plan.